R2v3 · Appendix B · Appendix C
If you repair and refurbish servers and GPUs for data centers and your customers now require R2, you need R2v3 with Appendix B (Data Sanitization) and Appendix C (Test and Repair). Underneath it sit certified ISO 14001 and ISO 45001 systems, or RIOS, and a certified quality system such as ISO 9001 because you test and repair. Certify Consulting builds all of it as one system and gets you ready for your certification body's audit. Full service runs $20,000 to $45,000 and takes 4 to 6 months, or up to 12 months when ISO 9001 is part of the project.
"Keep it Simple. Keep it Real."
Your Scope
Every R2 facility meets the ten Core Requirements: legal compliance, tracking, data security, Focus Materials, facility controls, transport and the rest. What changes from one facility to the next is the appendices, and a server and GPU refurbisher almost always lands on the same two.
Appendix B applies because servers arrive with drives and stored credentials. Appendix C applies because you test and repair equipment so it can be used again, and Appendix C brings a certified quality system with it.
The others depend on how you work. If you send boards, drives or batteries to other companies, Appendix A covers that chain. If you sell gear you never receive, Appendix F covers brokering. We settle this on the first call, because the scope drives the price, the timeline and which certificates you need.
Sanitize every data storage device, keep a software record for each unique identifier, sample at least 5% of erased media with a competent independent party (down to 1% once results stay clean), and keep 60 days of camera recordings wherever data-bearing equipment is handled
A written R2 Reuse Plan with test plans for each function, pass and fail criteria, product safety and recall checks, quality assurance on the tests themselves, and categories from SERI's R2 Equipment Categorization for every unit you sell
Appendix C requires a certified quality management system, such as ISO 9001 or RIOS, covering all the equipment and processes in your test and repair scope
Due diligence on every vendor that receives boards, drives, batteries or other R2 Controlled Streams from you
Applies when you arrange sales of equipment that never passes through your facility
Source: The R2 Standard (R2v3) by SERI, Core Requirement 7 and Appendices A, B, C and F.
On the Floor
Server and GPU work looks clean next to a shredding line, and that is exactly why some of it gets missed. The equipment is valuable, the volumes are high, and R2v3 still reaches into parts of it that nobody thinks of as data or as hazardous.
These are the places I look first in a gap assessment for a data center refurbisher. Each one comes straight from the standard, and each one is something an auditor can sample.
Some data center accelerators are also export-controlled under ECCN 3A090 and 4A090. If you resell them, see export-controlled electronics disposition.
Source: The R2 Standard (R2v3) by SERI, Core Requirements 7 and 8, Appendices B and C.
Data Sanitization
For physical destruction, R2v3 Core Requirement 7 points to the methods in Appendix A of NIST SP 800-88 Revision 1, and requires a verification process that shows the destruction worked every time. Appendix B adds its own table of destruction methods by device type, from hard drive shredding to SSD crushing.
For software erasure, Appendix B sets the rules: the software has to reach every user-addressable location, fail any drive it cannot fully erase, be patched and supported, and produce a record for each drive's unique identifier. Anything that cannot be confirmed as erased is physically destroyed.
NIST published Revision 2 of SP 800-88 in September 2025. Ask your certification body which revision it expects your procedures to reference, and write that answer into your plan.
Source: The R2 Standard (R2v3) by SERI, Core Requirement 7 and Appendix B.
How the Project Runs
One project, one system, built for the people who run the test benches and the sanitization cage.
A free consultation to settle which appendices apply and whether you need ISO 9001, RIOS or both. The scope sets the price and the timeline.
We walk the facility, read what you already have, and give you a prioritized list of what is missing and a dated plan to close it.
R2v3, ISO 14001, ISO 45001 and ISO 9001 written as one management system: one document set, one risk register, one training matrix, one audit program.
Data sanitization competency, test technician competency, and enough records on the floor for an auditor to sample.
A full internal audit and management review before your certification audit, including the annual data security audit R2v3 requires.
Help choosing a certification body on SERI's list, applying for your SERI license, and support through the Stage 1 and Stage 2 audits and any corrective actions.
Who Does the Work
Jared Clark builds R2v3 systems for electronics recyclers, refurbishers and ITAD companies, together with the ISO 14001, ISO 45001 and ISO 9001 systems R2v3 sits on.
Data center refurbishers get one more thing from us that most R2 consultants don't offer: the export control side. Jared also consults on ITAR and export compliance, so the same project can cover the accelerators that fall under ECCN 3A090 and 4A090.
Jared holds a JD and an MBA, and is a PMP, a Certified Manager of Quality/Organizational Excellence (CMQ-OE), a Certified Quality Auditor (CQA) and a Certified Pharmaceutical GMP Professional (CPGP). More about Jared.
Common Questions
Start by settling your scope. A server and GPU refurbisher usually needs the ten R2v3 Core Requirements plus Appendix B (Data Sanitization) and Appendix C (Test and Repair). You then need three certified management systems underneath it: ISO 14001 and ISO 45001 for environment, health and safety (or RIOS), and a quality system such as ISO 9001 for Appendix C (or RIOS, which covers both). After that comes the build: written procedures, data sanitization and test records, training and an internal audit. Then you apply for your SERI license and are audited in two stages by a certification body on SERI's list. Certify Consulting runs that whole path as one project. Full service runs $20,000 to $45,000 and takes 4 to 6 months, or up to 12 months when ISO 9001 is part of the project.
Usually Appendix B (Data Sanitization), because servers arrive with drives, and Appendix C (Test and Repair), because you test and repair equipment for reuse. Appendix A (Downstream Recycling Chain) applies if you send boards, drives or batteries on to other companies. Appendix F (Brokering) applies if you sell equipment you never physically receive. Appendix D (Specialty Electronics Reuse) is for untested specialty equipment and also requires Appendix C. Appendix E (Materials Recovery) applies only if you shred or demanufacture for materials.
You need a certified quality management system. Appendix C requires a facility certified for test and repair to also hold a certified quality management system, from an accredited certification body, covering all the equipment and processes in its Appendix C scope. SERI keeps the list of approved standards. ISO 9001 is the common choice, and RIOS covers the quality requirement too.
For physical destruction, R2v3 Core Requirement 7 names a method from Appendix A of NIST SP 800-88 Revision 1, with a verification process that shows the destruction worked every time. Appendix B adds its own table of destruction methods and its own rules for software erasure. NIST published Revision 2 of SP 800-88 in September 2025, so ask your certification body which revision it expects your procedures to reference.
Anything that can hold data does. Core Requirement 7 asks you to define in your Data Sanitization Plan which types of devices you accept that may contain data and how each one is sanitized. Servers carry drives, and their management controllers can keep user accounts, passwords and network settings. Appendix B requires all logins, passwords and connections to remote services to be removed. For each GPU or accelerator model, write down whether it can store user data and how you know, so your auditor can follow the decision.
They become Focus Materials. Circuit boards, whole or shredded, and batteries of every chemistry except mercury-free alkaline are Focus Materials under R2v3. Your Focus Materials Management Plan has to show how they are handled on site and tracked down your recycling chain until they reach a facility that recovers the metals or the first downstream R2 certified facility.
Plan on 4 to 6 months for R2v3 with ISO 14001 and ISO 45001, and up to 12 months when ISO 9001 is part of the project, which it usually is for test and repair. Appendix C also sets a clock of its own: equipment has to be tested, repaired or refurbished within one year of receipt, or evaluated and inventoried as parts for future repairs.
Certify Consulting's full service for R2v3 with ISO 14001 and ISO 45001 is $20,000 to $45,000. Facilities that test and repair also need ISO 9001, which puts them toward the top of that range. Separately, you pay the certification body for the audits, $20,000 or more for all three standards, quoted by the certification body, and you pay SERI a $150 application fee plus $2,000 a year for the license.
Certify Consulting does this work. Jared Clark builds R2v3 systems for electronics recyclers, refurbishers and ITAD companies, together with the ISO 14001, ISO 45001 and ISO 9001 systems underneath them, and runs it as one project. A certification body on SERI's list then audits you and issues the certificate. If you resell data center GPUs, Certify Consulting also handles the export control side, because some accelerators are controlled under ECCN 3A090 and 4A090.
Yes. SERI accepts RIOS as a single certification that meets R2v3's environmental, health and safety, and quality requirements, where the ISO route takes two or three certificates. SERI notes that ISO 14001 and ISO 45001 are the biggest single driver of audit time, so it suggests asking your certification body to compare audit time and cost for both routes. Your customers may also require a particular certificate, which can decide it.
R2v3 requirements on this page were checked against the published R2v3 text and SERI's public guidance on November 22, 2026. SERI's Version 3.1 added requirements for solar panels without changing the existing ones. Prices are Certify Consulting's published R2v3 ranges.
Schedule a free 30-minute consultation. Tell us what you take in, what you test and where the rest goes. We will tell you which parts of R2v3 apply, which certificates you need, and what the project would cost.
Or email us at support@certify.consulting