A common weakness in test and repair is that the facility did the testing, but cannot show it. A technician powered the laptop on, watched it boot, ran a quick check, and moved it to the "reuse" shelf. Three months later an auditor asks for the evidence behind a tested-working claim, and what exists is a pallet tag and somebody's memory.
Appendix C of the R2:2020 Code of Practice (the standard behind R2v3, published by SERI) covers test and repair. In my reading, it is where the claim "this equipment works" has to become a record. This guide walks through how to build that record: what the procedure should say, what each test record should capture, how repair fits in, and what an auditor is likely to sample.
One note before we start. This guide is my interpretation of how Appendix C applies in practice, and I am not quoting the standard or citing clause numbers, which I have not reproduced here. Items described as what an auditor will look for, and the record fields and sequences below, are recommended practice unless you confirm that your licensed copy of the R2 Code of Practice makes them a requirement. Wording, numbering, and SERI interpretations change over time, so check each item, including the required record retention period, against the current standard and SERI guidance before you finalize procedures.
What Does R2v3 Appendix C Cover?
Appendix C applies to facilities whose certified scope includes test and repair, meaning they evaluate used electronic equipment or components to decide whether it can be reused, and in some cases fix it first. It sits alongside the other appendices in the R2:2020 structure (titles below should be verified against your licensed copy; the third column is my commentary, not the standard's text):
| Appendix | Subject | Why it touches test and repair |
|---|---|---|
| A | Equipment Focus Materials (FMs, items needing special handling) | Batteries, CRTs, mercury-containing items and similar often show up during testing and repair |
| B | Data sanitization | Data-bearing devices have to be handled before or alongside testing |
| C | Test and repair | Functionality testing, repair, and the records that prove both |
| D | Specialized Electronics Refurbishing and Resale | Applies to certain equipment categories with their own requirements |
| E | Materials Recovery and Disposition | Where non-reusable output goes |
| F | Brokering/Intermediary-related requirements | Applies if you broker rather than process |
Whether Appendix C applies to you is decided at scope, under Core Requirement 1. If your certificate lists test and repair as a process, you carry the appendix. My decision criterion: if you evaluate equipment for functionality in order to reuse or resell it, or repair it for that purpose, treat Appendix C as applying. If you never test for reuse and send everything to recycling, it does not, but confirm with your certification body. Facilities sometimes discover mid-implementation that a "quick check before resale" counts as test and repair.
Scope is the first decision to get right, because it determines how much documentation you owe: a facility that claims reuse carries a heavier record burden than one that processes everything for materials recovery.
What Counts as Functionality Testing?
The word that causes most of the trouble is "functional." Powering a device on is a check that it receives power. Functionality testing, as I read the standard, evaluates whether the equipment performs the functions it was designed to perform, and whether it does so well enough that a buyer would reasonably call it working.
A useful way to hold the difference:
| Activity | Does it demonstrate functionality? |
|---|---|
| Visual inspection (cosmetic condition, missing parts) | No, it supports grading but proves nothing about operation |
| Power-on check | Partially, it shows the unit receives power and starts |
| Boot to operating system or firmware | Partially, it shows core boot components work |
| Documented test against defined criteria (display, input, storage, ports, battery, network) | Yes, if the criteria and results are recorded |
| Manufacturer or industry diagnostic run with a saved result | Yes, and usually the strongest evidence you can produce |
An auditor does not need you to run the most sophisticated test available. They need to see that your test matches the equipment, that the criteria were defined before the test and not after, and that a record exists for the specific unit or lot that you sold as tested.
What Documents Does an Appendix C Program Need?
Think of the documentation as four layers, each answering a different question an auditor will ask.
| Layer | Question it answers | Typical content |
|---|---|---|
| Procedure | How do you test? | Work instruction per equipment category, test criteria, pass/fail definitions |
| Competence record | Who is allowed to test? | Training records, authorization list, any manufacturer or vendor certifications |
| Test record | What happened to this unit? | Unit identifier, date, tester, tests performed, results, disposition |
| Repair record | What did you change? | Fault found, part or action, retest result, replaced components handled |
If any layer is missing, the others lose most of their value. A beautiful procedure with no test records proves intent. A pile of test records with no procedure proves activity but not that it followed any standard.
How Do You Write a Functionality Test Procedure?
Work through this in order. Each step is something I would expect to see traceable in your documents.
Step 1: Sort your equipment into test categories
Do not write one procedure for "electronics." Group equipment by what it does and how it fails, for example laptops, desktops, servers, mobile phones and tablets, monitors, network gear, printers, and components such as drives and memory. Each category gets its own test list because a monitor and a server share almost no meaningful tests.
Step 2: Define the criteria before you test
For each category, write what "functional" means. For a laptop that might include boot to a known state, display with no dead zones beyond your stated tolerance, keyboard and pointing device response, working ports, charging, battery condition recorded, wireless connectivity, and audio. The point is that the list exists in writing and does not change from tech to tech.
Where a manufacturer specification or recognized industry diagnostic exists, reference it by name and version. That gives the auditor something external to check your criteria against.
Step 3: Set pass, fail, and "not tested" outcomes
Every test needs a clear outcome. Most facilities need three dispositions, not two: functional, non-functional, and not tested. The third matters because some equipment cannot be tested economically or safely, and the honest label is better than a forced pass. How you describe that equipment to the next party is a downstream-disclosure question, so make sure your sales language matches your records.
Step 4: Identify the unit
A test record has to attach to something. Use a serial number where one exists, and an asset tag or lot ID you assign where it does not. Whatever you choose, it must stay with the equipment through the process, or the record becomes unusable the moment the equipment moves.
Step 5: Sequence data sanitization correctly
Data-bearing devices bring in Appendix B. The order of operations needs to be written down: whether testing happens before or after sanitization, how you prevent a test from exposing customer data, and how you verify sanitization status before the unit is released for resale. Facilities that test with the customer's own operating system still installed are the ones who get uncomfortable questions here.
Step 6: Assign authorized testers
Write down who may perform which tests and how they were qualified. This can be short: a training sign-off per category, reviewed when procedures change. The auditor is looking for a link between the person named on the test record and a competence record that predates the test.
Step 7: Tie the procedure to your management system
Your test and repair procedure should be controlled like any other document in your environmental, health, and safety management system (EHSMS), with version, approval, and a way to retire old copies. If you also run ISO 9001 or ISO 14001, the document control you already have usually covers this. Our ISO certification overview explains how those systems fit together with sector-specific schemes like R2.
What Should a Test Record Contain?
I would build the record template around the questions an auditor will ask when they pick a unit at random from your reuse inventory or a recent sale.
| Field | Why it matters |
|---|---|
| Unit identifier (serial, asset tag, or lot ID) | Connects the record to the equipment |
| Equipment type and model | Shows which procedure applied |
| Date and time of test | Establishes sequence relative to sanitization and sale |
| Tester name or ID | Links to competence records |
| Procedure and version used | Shows the test followed controlled criteria |
| Tests performed and individual results | The actual evidence of functionality |
| Diagnostic output or log reference | Strongest objective support |
| Battery or consumable condition, where relevant | Supports the claim a buyer will rely on |
| Overall disposition | Functional, non-functional, or not tested |
| Data sanitization status or reference | Shows the Appendix B handoff |
| Next step | Reuse, repair, refurbish, or materials recovery |
Two practical points. First, an electronic record from a test tool or asset system is usually better than a handwritten sheet, since it is timestamped and harder to alter after the fact. Second, batch records are acceptable only if they genuinely identify what is in the batch. A line reading "50 laptops tested OK" with no unit list does not allow anyone to verify a specific machine.
How Do You Document Repair?
Repair raises its own questions, because you are changing the equipment and may be generating waste in the process. Your repair record should capture:
- The fault found, tied to the original test result.
- The action taken, such as component replacement, reflash, or cleaning.
- The replacement part source, so you can show you did not introduce suspect or counterfeit components.
- The retest, run against the same criteria as the original test, with its own result.
- What happened to removed components, since a failed board or battery is now a downstream item that feeds your materials recovery and Focus Materials controls.
The retest is where I see the weakest evidence. Facilities often record that a repair was done and then treat the equipment as functional without a second documented test. If the equipment was non-functional on Monday and sold as working on Friday, the record in between should show a passing test after the repair.
Which Equipment and Components Need Special Attention?
Some items complicate the picture and are worth handling in your procedure explicitly:
- Batteries. They can be tested, and they are also Focus Materials territory under Appendix A when removed or failed. Decide how you test capacity or health, and how you manage swollen or damaged cells safely.
- Equipment containing displays, lamps, or other Focus Materials. Repairs that disturb these items need handling controls, not only a functional retest.
- Equipment subject to export controls. If you handle gear with restrictions, reuse decisions can intersect with destination and customer screening. See our page on export-controlled electronics disposition for how that layer fits in.
- Components harvested from non-functional units. A drive or memory module pulled from a dead machine needs its own test and its own record, since the host unit's status says nothing about it.
How Does Test Documentation Connect to Downstream Claims?
The thing a buyer or the next party in the chain relies on is your description of the equipment. If you describe it as tested and working, the test record is the evidence. If you describe it as untested or for parts, the record should say so and your paperwork should match.
The rule I would put on a wall: the words on the invoice, the label, and the listing must never be stronger than the record behind them. Mismatches between a sales description and a test record are among the easiest things for an auditor to find, because they can start from the sale and work backward.
Equally, equipment that fails testing and cannot be economically repaired has to follow your documented path to materials recovery, which is covered under Appendix E and your downstream vendor controls. A unit marked non-functional in your test record that later shows up in the reuse inventory is a finding waiting to happen.
What Will an Auditor Sample?
Auditors work from evidence trails, and they like to start at the end and walk backward. Expect some version of these:
- Pick a unit from reuse inventory or a recent sale and ask for its test record.
- Ask for the procedure version cited on that record and confirm it was current on the test date.
- Ask for the tester's training record and confirm authorization predates the test.
- Check that data sanitization status was verified before release.
- Pick a repaired unit and ask for the fault, the action, and the retest.
- Compare the sales description to the test disposition.
- Ask what happens to equipment classified as not tested or non-functional.
If you can answer each of those from records, not from explanation, you are in good shape. If answers depend on a person remembering, the finding is usually about records and not about the testing itself.
Common Documentation Failures
These are the patterns I would check for in an internal audit before the certification body does it for you:
- One generic procedure covering all equipment types.
- Criteria that live in a technician's head or an old training slide.
- Test records without a unit identifier, or with identifiers that do not survive repackaging.
- Records showing a pass with no individual test results behind it.
- Repair records with no retest.
- No "not tested" category, so untested equipment gets labeled working by default.
- Test performed before sanitization status is confirmed, with no written rationale.
- Procedure revisions with no way to tell which version a given record used.
- Sales descriptions that go beyond what the records support.
Appendix C Documentation Checklist
Use this as a working list during implementation or internal audit.
Procedures
- [ ] Scope confirms test and repair is in or out of the certified processes
- [ ] Separate test procedure for each equipment category
- [ ] Written pass, fail, and not-tested criteria
- [ ] Referenced manufacturer specifications or diagnostic tools, with versions
- [ ] Documented sequence with data sanitization
- [ ] Document control: version, approval, retirement of old copies
People
- [ ] List of authorized testers by category
- [ ] Training or qualification records dated before first authorized test
- [ ] Refresher or re-authorization when procedures change
Records
- [ ] Unit-level identifier that persists through the process
- [ ] Test date, tester, procedure version, tests, results, disposition
- [ ] Diagnostic logs retained and retrievable
- [ ] Repair record with fault, action, parts source, and retest
- [ ] Handling record for removed or failed components
- [ ] Retention period defined, matched to the minimum in your licensed R2 copy and any customer or legal requirements, and followed
Downstream
- [ ] Sales and shipping descriptions match test dispositions
- [ ] Non-functional and not-tested equipment routed per documented path
- [ ] Focus Materials generated during repair controlled per Appendix A
Where Should You Start?
If your current records are thin, do not try to rebuild everything at once. Start with one equipment category that makes up most of your reuse volume, write the criteria, build the test record template, train the testers, and run it for a few weeks. Then audit ten records against the checklist above. What you learn from that small sample will tell you more than a month of drafting procedures in the abstract.
If you want a second set of eyes on your procedures or a mock audit of your test records, you can reach out through our contact page. Either way, the goal is the same: when someone asks how you know a machine works, the answer is a record you can put in their hands.
Last updated: 2026-11-27. Written against the R2:2020 Code of Practice (R2v3). SERI guidance was not separately reviewed for this update, so confirm against the current guidance and your licensed copy.
Frequently Asked Questions
Does R2v3 Appendix C apply to every R2 certified facility?
No. Appendix C applies to facilities whose certified scope, defined under Core Requirement 1, includes test and repair. A facility that sends all equipment to materials recovery and makes no reuse claims may not carry it, but any evaluation for resale can bring it into scope.
Is powering on a device enough to document functionality?
Generally no. A power-on check shows the unit starts, not that it performs its designed functions. Your procedure should define criteria for each equipment category and record individual test results, ideally supported by a saved diagnostic log.
What should a functionality test record include?
At minimum: a unit identifier, equipment type, test date, tester, procedure version, tests performed with results, overall disposition (functional, non-functional, or not tested), data sanitization status, and the next step for the equipment.
Do repaired units need to be retested?
Yes, in practice. The repair record should show the original fault, the action taken, the source of replacement parts, and a documented retest against the same criteria before the unit is treated as functional.
How should untested equipment be handled?
Record it as not tested, route it through your documented path, and describe it accurately to downstream parties. Sales and shipping language should never claim more than your test records support.
Jared Clark
Principal Consultant, Certify Consulting
Jared Clark is the founder of Certify Consulting, helping organizations achieve and maintain compliance with international standards and regulatory requirements.