ISO 14971:2019 is the international standard for applying risk management to medical devices, including software as a medical device and in vitro diagnostics. It sets out a process, not a list of acceptable risks: the manufacturer decides what is acceptable, writes that down before the analysis, analyses and controls the risks against it, judges whether the overall residual risk is acceptable, and keeps watching once the device is on the market. Every step leaves a record in the risk management file.
This guide walks through the process clause by clause, explains where tools such as FMEA and fault tree analysis fit, and shows how the standard connects to ISO 13485, the FDA's QMSR and the EU MDR.
Why regulators expect it
ISO 14971 is voluntary as a standard, but it is the accepted method everywhere that matters:
- ISO 13485 clause 7.1 requires documented risk management throughout product realization, and design inputs, design changes, supplier controls and post-market feedback all have to consider risk.
- United States. FDA recognizes ISO 14971:2019 as a consensus standard. The QMSR, in force since 2 February 2026, incorporates ISO 13485:2016 by reference, so the clause 7.1 requirement now applies through 21 CFR Part 820.
- European Union. EN ISO 14971:2019+A11:2021 is harmonised under the MDR and IVDR. Its Annex ZA maps the standard to the General Safety and Performance Requirements, which require risks to be reduced as far as possible without adversely affecting the benefit-risk ratio.
- Other standards rely on it. IEC 62304 (software life cycle), IEC 62366-1 (usability engineering) and IEC 60601-1 (electrical safety) all assume an ISO 14971 process is in place.
The process, clause by clause
Clause 4: the framework
Before any analysis, four things must exist:
- A risk management process covering the whole life cycle (4.1).
- Top management commitment (4.2): adequate resources, competent people, and a documented policy for establishing criteria for risk acceptability. The policy states how the company decides what is acceptable, taking account of applicable regulations, relevant standards, the state of the art and stakeholder concerns.
- Competent people (4.3), with records of that competence.
- A risk management plan for each device (4.4), setting the scope, responsibilities, review requirements, the acceptability criteria for individual risks and for overall residual risk, verification activities, and how production and post-production information will be collected and reviewed.
Everything ends up in the risk management file (4.5), which must give traceability from each hazard through its analysis, evaluation, control and verification to the residual risk.
Clause 5: risk analysis
- Intended use and reasonably foreseeable misuse (5.2), including the intended users, use environment and patient population.
- Characteristics related to safety (5.3): energy, materials, software, measurement functions, sterility, connectivity and the other properties that could affect safety. Annex A of ISO/TR 24971 offers question lists to work through.
- Hazards and hazardous situations (5.4), in normal use and in fault conditions. A hazard is a potential source of harm; a hazardous situation is the circumstance in which someone is exposed to it; harm is the injury or damage that may result.
- Risk estimation (5.5) for each hazardous situation: the severity of the harm and its probability of occurrence. The probability is often broken into two parts, the probability that the hazardous situation occurs and the probability that it leads to harm, which is how the standard's Annex C explains the sequence of events.
Clause 6: risk evaluation
Each estimated risk is compared with the acceptability criteria in the plan. Risks that meet the criteria need no further reduction for that purpose; risks that do not go to risk control.
Clause 7: risk control
Clause 7.1 sets the order in which control options are considered:
- Inherently safe design and manufacture.
- Protective measures in the device itself or in the manufacturing process, such as alarms, guards or interlocks.
- Information for safety, such as warnings and instructions, and training where appropriate.
The control measures are implemented and their implementation and effectiveness verified (7.2). The residual risk is then evaluated against the criteria (7.3). If a residual risk is still not acceptable and further control is not practicable, the manufacturer may gather data and literature to decide whether the medical benefits of the intended use outweigh that residual risk (7.4, benefit-risk analysis). If they do not, the design or intended use has to change. Clause 7.5 asks whether the control measures introduced new hazards, and 7.6 confirms that every identified hazardous situation has been dealt with.
Clause 8: overall residual risk
Individually acceptable risks can still add up to an unacceptable device. Clause 8 requires an evaluation of the overall residual risk against the criterion in the plan, again with a benefit-risk analysis if it is not acceptable, and disclosure of significant residual risks to users, usually in the labeling.
Clause 9: risk management review
Before commercial release, the manufacturer reviews that the plan was carried out, that the overall residual risk is acceptable, and that methods are in place to collect production and post-production information. The results are recorded as the risk management report.
Clause 10: production and post-production
The process does not stop at release. The manufacturer must collect and review information from production, complaints, service, the published literature and comparable devices, and feed it back: is there a new hazard, is an estimated risk no longer accurate, is the overall residual risk still acceptable? If not, the file is updated and the controls revisited. In the EU this connects to the MDR's post-market surveillance plan and vigilance; in the US to complaint handling and reporting under 21 CFR Part 803 and 806.
Acceptability criteria and the risk matrix
Most companies express their criteria as a matrix of severity against probability, with each cell marked acceptable or not acceptable. The standard does not require a matrix, and it does not define the levels; both come from the manufacturer's policy. Three points cause most audit findings:
- Define the scales. "Remote" or "occasional" means nothing until it is tied to a number, such as a frequency per use or per device-year, so that two engineers estimate the same risk the same way.
- Justify the boundary. The criteria must be traceable to the policy and its inputs (regulations, standards, the state of the art), not chosen to make the current design pass.
- Treat "reduce as far as possible" correctly in the EU. Under the MDR a risk that meets your matrix may still need further reduction if a further control is possible without worsening the benefit-risk ratio. Annex ZA of EN ISO 14971:2019+A11:2021 explains the relationship.
ISO 14971:2019 does not use the ALARP concept or a three-region scheme. ISO/TR 24971:2020, the guidance document that accompanies it, describes ALARP as one way a manufacturer might frame its policy, not as a requirement.
Where FMEA, fault trees and other tools fit
ISO 14971 names no mandatory technique. The tools are inputs to risk analysis, each suited to a different question:
| Tool | Starts from | Good for | Limits |
|---|---|---|---|
| Preliminary hazard analysis | Hazards and use scenarios | Early design, complete hazard coverage | Little component detail |
| Design and process FMEA (IEC 60812) | Component or process-step failures | Finding failure modes and their effects | Misses hazards in correct operation and use errors |
| Use FMEA / use-related risk analysis (IEC 62366-1) | User tasks | Use errors | Needs task analysis first |
| Fault tree analysis (IEC 61025) | One undesired event | Combinations of causes, single points of failure | One top event at a time |
| HAZOP (IEC 61882) | Process parameter deviations | Manufacturing and fluid or thermal systems | Heavy for simple devices |
One practical caution about FMEA. Its risk priority number multiplies severity, occurrence and detection. ISO 14971 has no detection factor: a failure that would be detected in production affects the probability of harm, not a separate score. Many files therefore use the FMEA to find failure modes and then carry each resulting hazardous situation into the ISO 14971 severity-and-probability estimate, rather than ranking risk by RPN.
A short worked example
Take an infusion pump and the hazard of over-delivery of drug.
- Hazardous situation: the pump delivers at a higher rate than programmed and the patient receives an excess dose.
- Estimation: severity "critical" (serious injury possible); probability of the hazardous situation from the motor-control FMEA plus use-error data on programming; probability that it leads to harm estimated from the drug classes the pump is labelled for. Together they fall in a cell the plan marks not acceptable.
- Control, in order: an independent flow sensor that stops delivery on deviation (design); an occlusion and over-rate alarm (protective measure); a dose-limit library and confirmation screen (protective measure against use error); instructions on library maintenance (information for safety).
- Verification: bench tests of the sensor cut-off, alarm tests, a usability validation of programming under IEC 62366-1.
- Residual risk: re-estimated with the controls in place; now in an acceptable cell. The new hazard introduced by the sensor (a nuisance stop that interrupts therapy) is analysed in turn under 7.5.
Each step is a line or a document reference in the risk management file, traceable to the design inputs and verification records in the design and development file.
How it ties into the quality system
Risk management is not a separate project. In an ISO 13485 system it feeds and is fed by design inputs and design changes (design controls), supplier selection and control, process validation, complaint handling, CAPA and management review. An auditor will usually pick a complaint or a design change and follow it into the risk management file to see whether the estimate was revisited.
Where to start
If you are building a first file, start with the policy and the plan, because they set the criteria everything else is judged against, then a hazard analysis before any FMEA. If you have a file that is mostly an FMEA, check it against clauses 5.4, 8, 9 and 10, which are where such files are usually thin. For a gap assessment of a risk management file or a full ISO 13485 system, see our ISO 13485 consulting, and for the wider standard see what ISO 13485 is.
Frequently Asked Questions
Is ISO 14971 mandatory?
ISO 14971 is a voluntary standard, but in practice every major regulator expects it. FDA recognizes it as a consensus standard, the EU lists EN ISO 14971:2019+A11:2021 as harmonised under the MDR and IVDR, and ISO 13485 clause 7.1 requires a documented risk management process for which ISO 14971 is the accepted method.
Does ISO 14971:2019 use ALARP?
No. The 2019 edition requires the manufacturer to set its own criteria for risk acceptability in a policy and in the risk management plan. ALARP is discussed in the guidance document ISO/TR 24971 as one possible approach, and in the EU the MDR requires risks to be reduced as far as possible without adversely affecting the benefit-risk ratio.
Is an FMEA enough for ISO 14971?
No. An FMEA is a useful tool for finding failure modes, but it starts from component failures and misses hazards that occur when the device works as designed, such as use errors or biological hazards. ISO 14971 asks for a complete analysis of hazards and hazardous situations, so most files combine a hazard analysis with FMEAs and, where useful, fault trees.
Jared Clark
Principal Consultant, Certify Consulting
Jared Clark is the founder of Certify Consulting, helping organizations achieve and maintain compliance with international standards and regulatory requirements.